Since 1946


 

 

 


 

 

Crooked Creek Odor Control Facility   
Norcross, Georgia

This project involved adding odor control equipment and covers to existing tanks at an existing wastewater treatment plant, and repair of storm damage to two existing buildings. The repairs included storefront, HVAC, roofing, brick veneer, ACMU veneer, and structural remedies.

 

 


 


 

Indian Creek Water Reclamation Facility
Locust Grove, Georgia



The Indian Creek  project is a 1.5 MGD greenfield wastewater treatment plant with spray fields encompassing over 200 acres of land. The plant's unique Preliminary Treatment Unit offered a challenge with its tight radius grit structures and numerous elevation changes from the influent side to the discharge side.


 

 
Monroe Water Treatment Plant Expansion to 10 MGD
Monroe, Georgia

The plant expansion consisted of a two-story, 33,000 SF Membrane Building, construction of a new 850 SF high service pump station and chemical feed building, and renovation to an existing chemical feed building.

 
 


< BACK TO MUNICIPAL MARKET SEGMENT