
|
|
Crooked Creek Odor Control Facility
Norcross, Georgia
This project
involved adding odor control equipment and covers to existing tanks at an
existing wastewater treatment plant, and repair of storm damage to two
existing buildings. The repairs included storefront, HVAC, roofing, brick
veneer, ACMU veneer, and structural remedies.
|
|
 |
|
Monroe Water Treatment Plant Expansion to 10 MGD
Monroe, Georgia
The plant expansion consisted of a
two-story, 33,000 SF Membrane Building, construction of a new 850 SF high
service pump station and chemical feed building, and renovation to an
existing chemical feed building.
|
|